Assuming demand is still outstripping supply and knowing people are currently going into build on about day 136 then we can assume you have at least 32 working days to wait (just over 6 weeks). The FE TI should be better than the STRIX 3080 sooo.. £59 / week to bring it forward? Just some napkin...
Firstly no I did not (maybe because I have gone into building) but price wise it is not worth it, the performance increase is small compared to the price increase. If it speeds up receiving the item then it may be worth it for some just for the jumping of the queue though I have not received the...
Right thanks for the advice everyone.
I think I will stick with a case from PCS, I think the H500 ARGB has grown on me and is actually quite a bit cheaper so will go with that.
And @AgentCooper I will up the PSU as it really is not much difference in cash anyway.
Now fingers crossed we get to...
Yea had a long ride, 84 working days now. The email I got from them said: We are currently processing your order (number ******** ) but unfortunately we are awaiting stock on the following items: FRACTAL MESHIFY S2 BLACKOUT TEMPERED GLASS.
So that makes me think they are looking at mine soon. I...
Received an email saying they wont have my desired case until the end of April (FRACTAL MESHIFY S2) so they are asking if I would like to change to speed up my order.
Took me a long time to decide on the case the first time. I quite like the look of the Coolmaster H500M however I am not sure...
Had to change the case to fit the liquid cooler. Changed for the meshify S2 as I liked the look of it. Anything wrong with that case? Says its not in stock but I think it will arrive before my GPU does.
I didn't increase the PSU as I don't intend to upgrade.
I will leave the overclock on as I...